A changed unit number, closed service entrance or different receiving contact can leave a venue working from two versions of one gas order. Make the revision easy to identify, then record what the supplier actually confirms.
Start with the existing order
Put the existing order reference at the beginning of the message. Include the product description and quantity already confirmed, so the recipient can identify the right purchase. Say that you are requesting a change to that order. If you are unsure which reference applies, ask the supplier to identify it before making another purchase.
A message headed only “please use this address” can lose its meaning when several staff members are ordering. Keep the request in the existing order conversation where practical. If you use another contact channel, include enough context to connect the two records and retain the response together.
Separate the address from the access note
Write the full proposed destination: venue name, unit or level where relevant, street address, suburb and postcode. Then describe the receiving entrance separately. A different entrance within the same building and a different street address are distinct changes; make clear which one you mean.
Show the old detail and its proposed replacement beside each other. This makes a corrected unit number easier to spot than resending a long address without explanation. Include a date or revision label in your internal record, particularly if more than one person has discussed the change.
Ask what the supplier can still change
Request confirmation that the revision can be accepted for this order, and ask whether it changes the delivery arrangements or quoted total. Keep those questions open until answered. A sent request or automatic acknowledgement does not tell your staff whether the revised destination has been accepted.
If the delivery may already be underway, use the supplier’s stated order-support channel and explain the issue clearly. Ask how the existing delivery should be handled. Do not assume that a new purchase, an unconfirmed cancellation request or a message to an unrelated contact will amend the original order.
Include the access details that changed
SafeWork NSW’s road-freight guidance identifies information to communicate before a delivery where applicable, including vehicle restrictions, delivery times, the receiving area, reporting procedures and site rules. It also recommends consultation with the delivery site when planning loading and unloading. See the SafeWork NSW road-freight guide, loading and unloading section.
For a venue update, that means explaining a closed entrance or changed reception point through the venue’s established procedures. Have the responsible venue contact confirm any restrictions. Ask the supplier to assess whether the revised arrangement works for its delivery; avoid proposing an improvised route through a restricted area.
A short revision record
This is a blank working template for your own order, rather than a Tanks 247 acceptance policy. Keep private access information in the direct order conversation.
| Field | What to record |
|---|---|
| Existing order | Reference, confirmed product and quantity |
| Change requested | The old detail and exact proposed replacement |
| Destination | Complete address, with the receiving entrance separately identified |
| Receiving arrangements | Available venue contact, relevant window and changed site restriction |
| Supplier response | Accepted, declined or awaiting clarification; reference to the actual reply |
| Other effects | Any confirmed change to charges or delivery arrangements |
| Handover | Who updated the venue record and which staff have the confirmed version |
Hand over the confirmed version
Give the receiving team the supplier’s actual answer. Mark an unanswered request as pending so another staff member does not treat it as an agreed instruction. Retain the old confirmation, proposed change and final response together; distinguish the superseded detail without deleting its history.
The ACCC recommends keeping online-purchase documents such as emails, receipts and item descriptions. That supports a straightforward recordkeeping habit here: save the change correspondence with the original order. See ACCC guidance on buying online.
For an initial CO₂ enquiry, use our Sydney CO₂ order-enquiry guide. For product identity before ordering, read the nangs, nitrous oxide and CO₂ comparison. A delivery revision should stay tied to the exact product and order already discussed.